City of Frankenmuth
Department of Public Works
216 W. Schleier •  Frankenmuth, Michigan 48734
Phone: 989.652.3443
RBraeutigam@frankenmuthcity.com or KOBrien@frankenmuthcity.com 

Left to Right – DPW Superintendent Randy Braeutigam, Mark Daenzer, Kenneth Anklam, Robert Satow, Melvin Braeutigam, Ruben Braeutigam, Water Superintendent Kenneth O’Brien, Jacob Laux, Paul Bergman, Gary Schaeff, Michael Zehnder, Edward Block, Ben Rinaldi

Missing:  Ginny Foster

 

The Department of Public Works has a full-time superintendent, six full-time employees, and several part-time seasonal employees.  The DPW is responsible for the maintenance and general up-keep of the City streets, storm sewer drains, and detention basins, buildings, public grounds, street trees, sidewalks, and water and sewer mains.  

Click on the a link below for more information:


Ice & Snow Removal Procedure

The local police department usually does the calling when conditions warrant snow or ice removal.  1" or less requires salting.  More than 1" requires removal or plowing and salting.

 

[Back to Top]

 

Sidewalk Maintenance & Repairs

Approximately $25,000 is budgeted annually for sidewalk maintenance and repairs.  If damage is 1" or less, we will grind off edge.  If more than 1", we will remove and replace.

[Back to Top]

 

Monthly Brush Pick Up

 

Monthly brush pick up occurs on the  first Monday of every month, unless it falls on a holiday, in which case it will be on Tuesday.  The first 5 minutes of chipping are free, each 5 minute interval thereafter will cost $10 each. Click here for regulations.

[Back to Top]

 

Street Repair & Resurfacing

Criteria:  past maintenance cost, traffic count, age, and condition of surface.

[Back to Top]

 

Street Sweeping Procedure

As needed, approximately once per month from April through November, street sweeping will occur as weather permits.  We have approximately 56 miles of curb and gutter in the city that we cover.

[Back to Top]

 

Leaf Pick Up

Pick up of leaves occurs from Mid-October until late November.  We grind or shred leaves onto dump wagons and haul to a local farmer who then stockpiles and spreads them onto the farm fields. Place leaves on the street - 1 foot from the curb, no more than 18 inches high. Click here for regulations.

 

[Back to Top]

 

City Tree Program

The City Department of Public Works trims, removes, and replaces all trees within the right of ways and parks within the city limits.  We do not spray any trees.  We have a naturalist on staff and are a Tree City USA member.  The City employees a Landscape/Tree Specialist on staff

[Back to Top]

 

 

City Parks

The City of Frankenmuth Department of Public Works maintains grass, trees, and flowers as well as performs weed control, in all city owned parks. 

[Back to Top]

 

 

Flower Planting & Maintenance

The DPW handles the ordering, planting, and maintenance of all flowers in the parks and right of ways with the help of some civic groups. The City employees a Landscape/Tree Specialist.

CLICK HERE TO GO ON A FLOWER TOUR OF FRANKENMUTH

[Back to Top]

 

 

Minor Building Repair

The Department of Public Works handles minor building repair, roofing, painting, etc. on city owned buildings.

[Back to Top]

 

 

Sanitary Sewer Maintenance

The DPW does an annual inspection of every sanitary sewer manhole throughout the city.

[Back to Top]

Storm Water Management

In 1999, the city adopted a storm water management plan which regulates the flow of storm water so that the City Sewer System does not become overburdened upon reaching its capacity.  This plan includes restricting the flow of storm water by requiring a Storm Water Discharge Permit as stated in the following ordinance:
Storm Water Discharge Permit Requirements.  Any parcel of real estate which discharges storm water to the City's storm water drainage systems shall be limited in the amount of storm water which may be discharged from the premises to the capacity as outlined in the City's Storm Water Management Plan or due to City authorized storm drainage improvements.  Before any improvements are made, a storm water management and drainage plan shall be approved by the City Engineer in accordance with the requirements of the City's Storm Water Management Plan and a storm water discharge permit issued thereof.

[Back to Top]

Water Department

The City Water Departments Goal is to provide residents with a sage and abundant supply of drinking water. Click Here For More Information.